Tenant Improvement Guide

Tenant Improvement Permits in Nevada

Which building departments review tenant improvements in Nevada, what the permit set includes and how to keep plan review from delaying your opening.

Business owners reviewing a commercial office floor plan

Who issues the permit

The permit comes from the building department where the property is located, which is not always the city in the mailing address.

  • Clark County reviews projects in unincorporated areas, which include the Las Vegas Strip and large parts of the valley.
  • City of Las Vegas reviews projects inside city limits, including most of Summerlin.
  • City of Henderson and City of North Las Vegas each run their own building departments.
  • City of Reno, City of Sparks and Washoe County cover the Reno and Sparks area; Washoe County also covers Incline Village.
  • City of Elko and Elko County cover the Elko area.

What goes in the permit set

A typical tenant improvement permit set includes architectural floor plans, a life safety and exit plan, reflected ceiling plans, accessibility details, and mechanical, electrical and plumbing drawings, plus energy code documentation. Fire sprinkler and fire alarm changes are usually separate submittals to the fire authority. Restaurants and some other uses also go through health review.

Avoiding plan review delays

Most delays come from incomplete drawings or a mismatch between the design and the actual use. Common comments involve accessibility, exits, fixture counts and fire separations. A clear code analysis on the cover sheet and coordinated drawings shorten review. Respond to comments quickly and completely.

Inspections

Once the permit is issued, inspections follow the construction sequence: underground plumbing, rough-in inspections for framing, plumbing, mechanical and electrical, insulation and ceiling inspections, fire inspections and finally building final, which leads to the certificate of occupancy or final approval. The contractor schedules and attends each one.

Planning a Nevada build-out?

Share the suite address, approximate square footage and the date you need to open. A Nevada project manager calls back to set up a walk-through.

Common questions

Have a question about your space that is not answered here? Call and speak with a Nevada project manager.

Most work that changes walls, exits, plumbing, electrical, mechanical or fire systems does. Purely cosmetic work like paint and carpet often does not, but confirm locally.

It depends on whether the property is inside city limits or in an unincorporated area. We confirm the jurisdiction for every project.

Usually the tenant’s contractor pulls it under their license, with landlord authorization.

The building department’s approval that the space meets code for its use. You generally need it, or a final inspection approval, before opening.

Ready to build out your Nevada space?

From the Las Vegas valley to Reno and Elko, we walk the space, price every trade in writing and lay out a schedule that fits your lease.