Commercial tenant improvements across Nevada: Las Vegas, Henderson, Reno, Lake Tahoe and Elko

Home  /  Services  /  Tenant Improvement General Contractor
Tenant Improvement Services

Tenant Improvement General Contractor in Nevada

One licensed general contractor to run your build-out from the first walk-through to the certificate of occupancy, with every trade, permit and inspection coordinated under one schedule.

Contractor in a hard hat reviewing build-out plans with a business owner

What a TI general contractor actually does

A tenant improvement is a construction project inside an existing building, usually on a tight lease schedule. The general contractor is the one party responsible for turning a lease, a floor plan and a budget into a finished, inspected space. That means pricing the work, buying out the trades, pulling the permit, sequencing the crews, keeping the building’s landlord informed and closing out the job with the paperwork your landlord and lender expect.

On a Nevada build-out we usually manage 8 to 15 specialty trades at once: demolition, framing and drywall, plumbing, electrical, HVAC, fire sprinkler, low voltage, flooring, paint, millwork, glazing and signage. Each has its own inspection, and most depend on the one before it. The general contractor’s job is to keep that chain moving so your opening date holds.

Licensing in Nevada

Commercial construction in Nevada is licensed by the Nevada State Contractors Board. A general building contractor holds a B classification, and every license carries a monetary limit on the size of a single job. Before you sign, ask any contractor for their license number and limit, confirm it on the Board’s website, and make sure their insurance certificate names your landlord the way your lease requires.

Specialty work such as electrical, plumbing, HVAC and fire protection is performed by subcontractors holding the matching specialty classifications. We hire licensed subcontractors for each trade and carry them under our contract, so you sign one agreement and get one point of contact.

How we run a build-out

  • Site walk and scope. We walk the space with you, review the lease exhibit or landlord work letter and confirm what the landlord delivers and what the tenant builds.
  • Design and permit. We work with your architect, or bring one, to produce permit drawings, then submit to the local building department and answer plan review comments.
  • Buyout and schedule. Trades are priced, long-lead items such as HVAC units, storefront and switchgear are ordered early, and a schedule is built backward from your opening date.
  • Construction. Daily supervision, weekly owner updates, coordinated inspections and a clean, safe site in an occupied building.
  • Closeout. Final inspections, certificate of occupancy, punch list, as-built drawings, warranties and lien releases.

Working with Nevada landlords and property managers

Most commercial landlords in Las Vegas, Henderson and Reno have building rules for contractors: approved hours for noisy work, freight elevator bookings, shutdown notices for fire sprinkler and electrical work, and insurance requirements. We get those rules in writing before we start and build them into the schedule, so your project does not create problems with your landlord or your neighbors.

If your lease includes a tenant improvement allowance, we also prepare the documentation landlords typically ask for before releasing funds: invoices, lien releases and proof of final inspection. Read our guide to tenant improvement allowances for more.

Tenant Improvement General Contractor questions

Have a question about your space that is not answered here? Call and speak with a Nevada project manager.

If the work needs a building permit, which most changes to walls, plumbing, electrical, HVAC or exits do, you need a properly licensed contractor. A general contractor is the simplest way to coordinate more than one trade and keep the permit in one name.

A light office refresh can take a few weeks. A full second-generation office, medical or restaurant build-out usually takes 8 to 16 weeks of construction, plus design and permit time before that. Long-lead equipment often sets the schedule.

Yes. We phase work, schedule noisy or disruptive tasks after hours when the building allows it, and keep dust and safety barriers in place so the occupied part of the space keeps running.

We work across Southern Nevada, including Las Vegas, Summerlin, Henderson and North Las Vegas, in Northern Nevada in Reno, Sparks and Incline Village, and in Elko.

Ready to build out your Nevada space?

From the Las Vegas valley to Reno and Elko, we walk the space, price every trade in writing and lay out a schedule that fits your lease.