The decisions you make before you sign a lease shape the cost, schedule and success of your build-out. Here is how to plan a tenant improvement in Nevada.

General contractor and client reviewing construction documents for an office build-out

Start before you sign the lease

The best time to involve a contractor is before the lease is signed. At that point you can still choose between spaces, negotiate the tenant improvement allowance and ask the landlord to fix problems. After signing, those problems become your costs.

  • Walk each candidate space with a contractor.
  • Check the age and condition of HVAC units, electrical service and restrooms.
  • Confirm the space’s current occupancy and whether your use is a change of occupancy.
  • Ask about sprinklers, fire alarm, exits and accessibility upgrades your use might trigger.

Get a test fit

A test fit is a quick floor plan showing whether your program fits: the number of offices, exam rooms, seats or workstations, plus restrooms, storage and support spaces. Pair it with a budget range, and you have the information you need to compare spaces and negotiate.

Understand the work letter

The lease exhibit, often called the work letter, spells out what the landlord delivers, what the tenant builds, how the allowance is paid and who approves the drawings. Read it with your contractor. Small details, such as whether HVAC units are delivered in working order or whether the landlord’s contractor must be used for certain work, change the budget.

Set the schedule from the opening date

Work backward from the date you need to open: construction time, permit review, design and lease negotiation. In Nevada, permit review times vary by city and project type. Restaurants and medical spaces need more time than simple offices. Build in time for long-lead equipment.

Planning a Nevada build-out?

Share the suite address, approximate square footage and the date you need to open. A Nevada project manager calls back to set up a walk-through.

Common questions

Have a question about your space that is not answered here? Call and speak with a Nevada project manager.

Before you sign the lease, ideally while you are still comparing spaces.

A quick preliminary floor plan that shows whether your program fits a space, used to compare options and estimate cost.

Arrangements vary. Some landlords and brokers provide test fits; otherwise a designer or contractor can prepare one.

For a full build-out, several months from lease signing to opening is common.