Commercial tenant improvements across Nevada: Las Vegas, Henderson, Reno, Lake Tahoe and Elko

Home  /  Project Types  /  Restaurant Build-Outs
Project Types

Restaurant Build-Outs in Nevada

Commercial kitchens, dining rooms and bars built through building, fire and health department review, ready for inspection and opening day.

Office build-out in progress with open ceilings, lifts and glass panels staged on site

The most complex tenant improvement

A restaurant build-out combines almost every trade: plumbing for floor sinks and grease interceptors, hood exhaust and makeup air, fire suppression, heavy electrical and gas loads, walk-in coolers, cleanable finishes and a dining room that sells the concept. It also goes through more reviews than most projects: the building department, the fire department and the health district.

  • Kitchen layout and equipment coordination
  • Type I hoods, exhaust and makeup air
  • Grease interceptors and floor sinks
  • Walk-in coolers and freezers
  • Bars, dining rooms and patios
  • Restrooms sized for the seat count

Health department review

In the Las Vegas valley, food establishments go through the Southern Nevada Health District’s plan review and inspections. In the Reno and Sparks area, Northern Nevada Public Health handles food establishment review. Health review covers finishes, sinks, equipment and layout, and it runs alongside the building permit. We coordinate the drawings so the building and health plans match.

Second-generation restaurants

Taking over a former restaurant can save a lot of money if the hood, grease interceptor and walk-in are in good shape and the right size. It can also hide problems. We inspect existing equipment and systems with you before you sign so you know what can be reused.

Opening on time

Hoods, walk-ins and some kitchen equipment are long-lead items, and final inspections must happen in the right order. We build the schedule around those items and the final health inspection so you can open on the date you plan.

Planning a Nevada build-out?

Share the suite address, approximate square footage and the date you need to open. A Nevada project manager calls back to set up a walk-through.

Common questions

Have a question about your space that is not answered here? Call and speak with a Nevada project manager.

Design, building and health review and construction together usually take several months. A second-generation space with a reusable kitchen can be faster.

Most restaurants that cook do. Size depends on the menu, fixtures and sewer authority rules.

Sometimes, if it is the right type and size and passes inspection. We check before you sign.

We coordinate the health plan submittal with your designer and attend inspections.

Ready to build out your Nevada space?

From the Las Vegas valley to Reno and Elko, we walk the space, price every trade in writing and lay out a schedule that fits your lease.