Commercial tenant improvements across Nevada: Las Vegas, Henderson, Reno, Lake Tahoe and Elko
Test-fit floor plans, permit drawings and plan review handled for you, so your build-out is designed to your lease, your budget and the building department’s requirements.
Before you sign a lease, a test fit shows whether the space actually works: how many offices, exam rooms or seats fit, where the restrooms and kitchen go, and whether the existing exits, plumbing and HVAC can support your use. It is the cheapest point in a project to find a problem. We prepare test fits with an architect or designer and pair them with a budget range, so you can negotiate your lease and tenant improvement allowance with real numbers.
Most tenant improvements in Nevada need a building permit. The permit set normally includes a floor plan, life safety and exit plan, reflected ceiling plan, accessibility details, and mechanical, electrical and plumbing drawings. Fire sprinkler and fire alarm changes are usually separate deferred submittals reviewed by the fire department. Restaurants and some medical uses also need health department review.
Turning an office into a clinic, a retail shell into a restaurant or a warehouse into a gym is a change of occupancy, and it can trigger requirements the old tenant never had: more plumbing fixtures, a grease interceptor, more exits, a fire sprinkler upgrade or accessible restrooms. We flag those items during the test fit, before they turn into change orders.
Plan review comments are normal. We track them, coordinate the responses with the design team and resubmit quickly. While the permit is in review we finish pricing and order long-lead items so construction can start as soon as the permit is issued.
Share the suite address, approximate square footage and the date you need to open. A Nevada project manager calls back to set up a walk-through.
Have a question about your space that is not answered here? Call and speak with a Nevada project manager.
Many commercial tenant improvements need drawings prepared by a Nevada-registered architect or engineer, especially when exits, structure, occupancy or MEP systems change. Simple non-structural work can sometimes be permitted with simpler drawings. We tell you which applies after we see the scope.
It depends on the jurisdiction, the season and the complexity. Simple office projects can move in a few weeks; restaurants, medical and change-of-use projects take longer. We give you a realistic range for your city when we scope the job.
Demolition of non-structural finishes is sometimes allowed with a separate demolition permit. Most construction has to wait for the building permit, so we use that time to buy out trades and order materials.
We do. The permit is pulled under our contractor license, and we schedule and attend every inspection.
From the Las Vegas valley to Reno and Elko, we walk the space, price every trade in writing and lay out a schedule that fits your lease.
Tenant improvement contractor for Nevada offices, clinics, stores, restaurants and warehouses, from Las Vegas and Henderson to Reno, Lake Tahoe and Elko.
© 2026 Nevada Tenant Improvement Contractors. All rights reserved. Part of the Tenant Improvement Licensed Contractors network.