Commercial tenant improvements across Nevada: Las Vegas, Henderson, Reno, Lake Tahoe and Elko

Home  /  Services  /  Framing, Drywall & Acoustic Ceilings
Tenant Improvement Services

Metal Stud Framing, Drywall & Acoustic Ceilings in Nevada

The walls and ceilings that define your space: metal stud partitions, fire-rated and sound-rated assemblies, drywall finishes and acoustic ceiling systems.

Crew framing metal stud partitions during a commercial office tenant improvement

The core of every build-out

Framing, drywall and ceilings are the largest scope on most tenant improvements. Light-gauge metal studs lay out the offices, exam rooms, restrooms and corridors from your floor plan. Drywall closes them in after the plumbing, electrical, data and HVAC rough-ins are inspected. Acoustic ceilings then cover the plenum and set the look and sound of the room.

Rated and sound-control assemblies

Not every wall is just a wall. Corridors, demising walls between tenants and some equipment rooms need fire-rated assemblies built exactly to a tested design, with rated penetrations and firestopping at every pipe, duct and cable. Conference rooms, medical offices and HR offices often need sound control: insulation, walls carried to the structure above and sealed penetrations. We build to the assembly on the drawings and keep the inspector’s checklist in mind.

  • Metal stud partitions, soffits and bulkheads
  • Fire-rated corridor, shaft and demising walls
  • Sound-insulated walls for privacy
  • Drywall finish levels matched to the paint and lighting
  • Acoustic ceiling tile and grid, and drywall ceilings
  • Access panels and firestopping

Choosing the right ceiling

Acoustic tile and grid is the most common choice because it is quick to install and easy to access above. Higher-end tiles improve sound absorption in open offices. Exposed ceilings with painted structure and ductwork are popular for creative offices and restaurants, but they need careful coordination of everything that will be visible.

Inspections that drive the schedule

Most building departments in Nevada inspect framing and insulation before drywall goes up. A failed cover inspection pushes back every trade behind it. We walk the space before every inspection so the inspector sees finished, labeled rough-ins.

Framing, Drywall & Acoustic Ceilings questions

Have a question about your space that is not answered here? Call and speak with a Nevada project manager.

Demising walls, rated walls and many sound walls do. Typical interior office walls often stop just above the ceiling. The drawings and code requirements decide which is which.

Drywall finishes are graded by level. Higher levels mean more coats and sanding for smoother walls, which matters under strong side lighting or with glossy paint.

Usually, if the tile and grid are still made. When they are not, we suggest replacing whole rooms so the ceilings look consistent.

We lay out walls early, get MEP trades in right behind the framers, and walk every area before inspections are called.

Ready to build out your Nevada space?

From the Las Vegas valley to Reno and Elko, we walk the space, price every trade in writing and lay out a schedule that fits your lease.